1/23/06 Site cleared 2/6/06 Site graded 2/9/06 Foundation trenches have been dug 2/10/06 Foundation poured 2/23/06 3/06/06 Block laying underway 3/06/06 More block, clock pier forms being placed 3/13/06 More block, water drain excavation starting 3/16/06 Steel supports up 3/16/06 Clock and fountain piers poured 4/13/06 The floor is poured |
4/27/06 Roof work 5/09/06 More roof work 7/03/06 HVAC unit pads being poured |