3/28/06 Clock pier 6/08/06 hallway wall frame installation 6/20/06 wall installation between rooms 6/23/06 overhead ductwork being installed 7/02/06 piers and raised-floor supports 7/06/06 wall insulation installation 8/09/06 raised floor and cable tray installation |